欧美日韩国产精品-欧美日韩国产剧情-欧美日韩国产伦理-欧美日韩国产欧美-you ji z z日本人在线观看-you jizz jizz japan日本

Your current location:Home -News -Industry news
Industry news

How to operate and maintain the hot runner system?

Date:2023-03-24View:9775

Production, operation and maintenance of hot runner system:


(1) Preparation

The mould worker connects the cooling water channels of the moving mould, the fixed mould and the hot half mould. If the temperature requirements on both sides of the dynamic mold and the fixed mold are different, a separate water path must be connected for rotation. If the product appearance quality requirements are high, it is recommended to separate the mold temperature on both sides of the moving and fixed mold: if the heat generated by the heating of the hot runner on the side of the hot half mold is more, the cooling water can be separately connected; if the heat generated by the heating of the hot runner on the side of the hot half mold is absorbed or lost by the template, the model can be connected with the warm water at the appropriate temperature to compensate for the heat loss.


The heating cable between the hot runner and the thermostat shall be connected correctly according to the mark of the plug, and the plug QQ shall be locked to prevent loosening. If the heating output cable is connected reversely with the heating cable, all thermocouples will be burnt. After the mold is packed, the screw temperature of the first injection molding machine reaches the required set temperature. At the same time, turn on the mold temperature machine for heating, so that the mold temperature reaches the set temperature required for production. Then change the working temperature of the heated hot runner system to plastic.


It should be noted that after the hot runner of the new mold rises to the set temperature, it will take about 5 to 10 minutes (to ensure uniform heating). If the raw material contains fiberglass, it will take longer (about 10 to 15 minutes) because the heat transfer performance of the tungsten steel tip is poor.


(2) Power on

First of all, find out the raw materials used in the last mold test, adjust the temperature of the screw and nozzle of the injection molding machine to the temperature of the raw materials in the melting state, and select the appropriate plastic materials to clean the screw


If the plastic produced contains LCP + 30% glass fiber, clean the hot runner with pure LCP material (without glass fiber). After opening, it should be noted that the rubber outlet is very smooth; when it is found that one or several hot nozzles do not produce materials, there are two situations as follows:


There is cold material in the gate, which can be baked and melted by hot air gun, and then the safety door is closed to spray glue again;

If there is still hot nozzle without material, find out the number of nozzle according to the location map of hot nozzle. The temperature of the nozzle is increased by 10 ~ 20 ℃ on the original basis, and then it is ignited immediately (no more than 3 times). After tapping the glue, cool it to production temperature. At this time, if the gate is still blocked, the production shall be stopped immediately, and the hot nozzle of the blocked rubber shall be removed from the lower mold or the supplier shall be informed to handle it.


3) Stop waiting

Immediately clean the rubber in the hot runner with pure LCP material to keep the residual material in the hot runner and the head of the hot nozzle inside. It is a LCP material with good fluidity in the whole process, and ensure the next test or production to be carried out smoothly. For more than 5 minutes due to machine failure or other reasons, it is necessary to put the hot runner in the insulation state of 250 ℃; if more than 10 minutes, it is set to 120 ℃.


(4) Change the color of raw materials

Clean the barrel and screw with raw materials until the old color is completely clear. Check the machine's nozzles and hot runner gates for old colors. Open the mold core and remove the plastic in front of the nozzle.


(5) Stop machine repair mold

Before separating the hot runner from the core, make sure that the hot runner heating output is closed and the nozzle temperature is cooled to room temperature (< 60 ℃). If the raw material contains glass fiber, use the raw material without glass fiber to remove the raw glass fiber material, otherwise the glass fiber material may be carbonized in the next heating.

国产91精品一区| 久久国产影院| 成人免费一级纶理片 | 高清一级淫片a级中文字幕| 青青久久精品国产免费看| 免费一级生活片| 九九精品在线播放| 午夜欧美成人久久久久久| 二级片在线观看| 夜夜操网| 香蕉视频久久| 九九九在线视频| 精品视频免费在线| 高清一级毛片一本到免费观看| 国产成人啪精品| 天天做日日爱夜夜爽| 一a一级片| 精品国产亚洲人成在线| 国产a视频| 九九热精品免费观看| 日本伦理片网站| 国产精品自拍一区| 日韩在线观看免费| 精品国产亚洲人成在线| 尤物视频网站在线观看| 成人av在线播放| 亚洲精品永久一区| 精品国产一区二区三区久久久狼| 美女免费精品视频在线观看| 天天做人人爱夜夜爽2020| 你懂的日韩| 毛片的网站| 亚洲精品影院一区二区| 欧美日本免费| 欧美激情一区二区三区视频 | 国产高清在线精品一区a| a级黄色毛片免费播放视频| 麻豆系列 在线视频| 国产视频久久久| 精品久久久久久中文| 国产91丝袜在线播放0| 好男人天堂网 久久精品国产这里是免费 国产精品成人一区二区 男人天堂网2021 男人的天堂在线观看 丁香六月综合激情 | 国产精品1024在线永久免费 | 久久国产一久久高清| 色综合久久手机在线| 九九热精品免费观看| 国产视频一区二区在线播放| 久久国产影院| 欧美日本免费| 毛片高清| 精品久久久久久免费影院| 国产极品白嫩美女在线观看看| 999久久66久6只有精品| 久久99青青久久99久久| 欧美a级片免费看| 久久99青青久久99久久| 好男人天堂网 久久精品国产这里是免费 国产精品成人一区二区 男人天堂网2021 男人的天堂在线观看 丁香六月综合激情 | 91麻豆精品国产自产在线观看一区 | 色综合久久手机在线| 91麻豆精品国产片在线观看| 日日日夜夜操| 午夜激情视频在线播放| 久久国产精品只做精品| 午夜精品国产自在现线拍| 午夜家庭影院| 九九精品在线播放| 久久久成人网| 国产麻豆精品| 亚久久伊人精品青青草原2020| 四虎影视库| 国产精品1024在线永久免费 | 国产伦精品一区二区三区在线观看 | 国产伦精品一区三区视频| 欧美国产日韩在线| 香蕉视频亚洲一级| 韩国毛片| 青草国产在线观看| 精品在线免费播放| 国产极品白嫩美女在线观看看| 国产亚洲精品aaa大片| 欧美激情伊人| 国产网站免费在线观看| 国产不卡在线看| 色综合久久天天综线观看| 亚洲第一页色| 国产成人精品影视| 韩国三级视频网站| 一级女性全黄生活片免费| 夜夜操网| 一级女性全黄久久生活片| 国产网站在线| 一本伊大人香蕉高清在线观看| 欧美夜夜骑 青草视频在线观看完整版 久久精品99无色码中文字幕 欧美日韩一区二区在线观看视频 欧美中文字幕在线视频 www.99精品 香蕉视频久久 | 欧美大片一区| 精品视频免费观看| 精品国产亚洲人成在线| 欧美激情一区二区三区视频 | 亚洲精品久久久中文字| 久久成人性色生活片| 免费国产一级特黄aa大片在线| 国产视频久久久| 尤物视频网站在线观看| 毛片的网站| 天堂网中文在线| 一 级 黄 中国色 片| 日韩中文字幕在线亚洲一区| 97视频免费在线观看| 国产伦久视频免费观看 视频| 日韩一级黄色| 日韩专区一区| 久久精品店| 精品国产一区二区三区久久久狼| 91麻豆精品国产片在线观看| 沈樵在线观看福利| 日本免费乱人伦在线观看| 二级片在线观看| 国产精品12| 国产亚洲精品成人a在线| 精品久久久久久中文| 欧美18性精品| 成人影院一区二区三区| 毛片的网站| 青青久热| 久久久久久久网| 99久久视频| 日韩免费片| 免费的黄视频| 美女免费精品高清毛片在线视| 你懂的福利视频| 国产一区二区高清视频| 欧美大片a一级毛片视频| 久久久久久久网| 亚洲wwwwww| 日韩一级黄色大片| 国产91丝袜高跟系列| 欧美爱色| 韩国三级香港三级日本三级| 可以免费看毛片的网站| 国产91精品一区| 好男人天堂网 久久精品国产这里是免费 国产精品成人一区二区 男人天堂网2021 男人的天堂在线观看 丁香六月综合激情 | 成人免费高清视频| 日日夜夜婷婷| 亚久久伊人精品青青草原2020| 欧美一级视频免费观看| 中文字幕一区二区三区 精品| 青青青草影院| 国产视频一区二区三区四区| 日本免费看视频| 色综合久久天天综合观看| 香蕉视频久久| 欧美激情一区二区三区视频高清| 毛片的网站| 日韩中文字幕一区二区不卡| 四虎久久精品国产| 可以在线看黄的网站| 一级片片| 精品视频在线观看一区二区| 免费毛片基地| 可以免费看毛片的网站| 一本伊大人香蕉高清在线观看| 成人高清视频免费观看| 国产成人精品一区二区视频| 九九九在线视频| 99久久精品国产免费| 九九九国产| 九九九在线视频| 韩国三级一区| 在线观看导航| 国产伦精品一区二区三区在线观看 | 四虎久久精品国产| 亚洲精品久久久中文字| 国产欧美精品| 久久精品欧美一区二区| 国产91丝袜在线播放0| 亚洲精品中文一区不卡| 久久久久久久网| 欧美a免费| 韩国三级香港三级日本三级| 欧美另类videosbestsex视频 | 色综合久久天天综合绕观看| 精品国产亚洲人成在线| 日日日夜夜操| 日韩一级黄色大片| 欧美爱爱动态| 国产a免费观看| 久久精品欧美一区二区| a级黄色毛片免费播放视频| 免费一级片网站| 国产网站免费视频| 一级毛片视频免费| 青青久久精品| 高清一级做a爱过程不卡视频| 91麻豆精品国产自产在线观看一区 | 国产不卡高清| 欧美国产日韩久久久| 人人干人人插| 精品视频一区二区三区| 欧美国产日韩一区二区三区| 免费一级片网站| 免费一级生活片|